Planning of a transmission test field T23
In 2007 the first construction phase including 10 endurance test stands and 14 component test stands was finished
The future units are mounted and tested in these modern transmission test stands.
The following necessary media were calculated and planned by our company:
Planning and calculation of the necessary media
Fuel supply
Cooling water and cold water supply
Hot water supply
Fresh water supply
Test stand ventilation
Combustion air supply
Exhaust gas disposal
Technical features
Motor power: 250 to 400 kW
Temperature range: 35°C to +40°C ± 2K
Exhaust gas flow: 1000 to 1800 kg/h
Combustion air: 1000 to 1600 kg/h